Friday, October 2, 2009

01 to 02/10/2009

THURSDAY
We started cleaning at Sehoale where Etean suggested that we should go and clean,paint and align cabbles and wires at the main DB supplying Sehoale.

FRIDAY
We managed to complete the painting for the previous day.Earlier on we were told to do the light wiring for the machenical workshop.All the task performed was done under the supervision of Heino and Etean.During the tasks done,I have learned that through hard work success is ahead of you.

Wednesday, September 30, 2009

29 to 30/09/2009

On the 29th of September 2009 we went to Mr Van Ransberg's house as we were told to go and fix his roofing.During the process of our work, we concluded by doing maintenance around the house.The task was done along with Mr Lebese where I have learned that everywhere you go proper maintenance should be done at all times

Today the 30th we went to Sehoale to dig up a trench because a live cable was lying around which was a hazard to the community.I have learned that in every environment everyone should take safety into consideration

Tuesday, September 29, 2009

Rewiring :25/09/2009

It was Friday morning where we were told to go and rewire the infra red light at wild life centre clinic.Before performing the given task,we had to do proper planning ensuring that we have all the required materials.We did the measurement on how the trunking should be mounted according to our planning.The task given to us was done under the supervision of Etean.In conclusion I have leaned that through planning,dedication and team work we can achieve better.

Friday, September 18, 2009

Designing:18/09/2009

Today we started by looking for the old iron sheet in our scrap yard.Our purpose was to use them to design the stand for posters.The job was not easy because we had to do the grinding,cutting,measuring and the welding.In conclusion I have learned that through multi- skills,you can save a lot by doing things from old materials.

Wiring:15/09/2009

It was tuesday morning,we left to town where we mounted the skirtins to pull wires through it and installed red plugs.Our task was easier because Etean who was our manager for the day did the planning before we could perform the task at hand.After job completion I have learned that through communication,undrstanding and planning we can make the dufficult tasks simpler.

Thursday, September 17, 2009

Assessment:09/09/2009-11/09/2009

Wednesday to friday

We started with our assessment on Wednesday.As we were told to prepare ourselves,it was easier for us because Mr R.S Hagemann did everything as planned.During the assessment I taught myself that without proper studying you wont make it through the assessment.I have learnt that through dedication and hard work the impossible becomes possible.

Wednesday, August 26, 2009

Manual: 24/08/2009-26/08/2009

Monday &Tuesday.

Monday we started with our new module known as Low voltage network cable assisted by Mr Louis.Since we got the manual monday morning,we had to make a study in order to learn what is expected from us.On tuesday we continuied with the manual trying to create questions for us to put in our POE.

Wednesday.
Today we gathered in our classroom to do the planning on what we are going to do for the day.We did the farm inspection which was more of a learning to our field of engineering.However it was a great experience, I have learned how to do an inspection and find faults using the regulations for instance to check if the circuit breaker correspond with the wires/cables.